Device stayed in the well for 10 month. The water cone eliminated. GOR decreased by 24%.

Kokdumalah,289 Uzbekistan.Midl East Asia 2001
     
  Kind Of Operations Oil
bbl/d
Water % GOR
SCF/bbl

Before:

Oil and gas-condencate field,oil level,flowing

674 10 6160

After:

Oil and gas-condencate field,oil level,flowing

762 0 4928